Skip to the content
Know your tech before you buy it. Makers: get listed from $49/mo

Asta Powerproject

elecosoft.com

  • Windows
  • macOS
  • Web
  • iPhone and iPad
  • Android
7.1 Club score Visit elecosoft.com

What Asta Powerproject is

Asta Powerproject is construction planning software for work ranging from home extensions to megaprojects. It lets teams build Gantt schedules from task pools and code libraries, link activities for critical-path analysis, and assign calendars, resources, and costs. Planners can compare scenarios for different construction methods or faster delivery, while tracking budgeted, planned, and actual costs over time. Resource planning covers people, plant, and materials. Risk analysis assesses possible delays and cost overruns, and Schedule Quality Check can apply custom parameters or DCMA and CIOB metrics.

The standard desktop client runs on Windows Professional or Enterprise. A hosted SaaS version is available on Windows and macOS computers with an internet connection, but does not include features such as macros and the Developers' Toolkit. A free Project Viewer can open plans made in Asta Powerproject, Microsoft Project, or Oracle Primavera for viewing, navigation, and printing. The single-user subscription costs £695 per annum, excluding VAT; other licence prices require contacting the team.

Who it suits

It suits construction teams that need detailed scheduling, cost and resource planning, or scenario analysis. The desktop client is for Windows, while SaaS supports access from Windows and macOS computers.

Good to know, and what to watch

  • Links tasks for critical-path analysis.
  • Compares multiple construction scenarios.
  • Tracks budgeted, planned, and actual costs.
  • Supports Microsoft Project and Oracle Primavera files.
  • No free plan is listed.
  • Desktop client runs only on Windows.
  • SaaS lacks macros and the Developers' Toolkit.
  • Single-user subscription costs £695 per annum, excluding VAT.

Concurrent licence

—

Enterprise

—

SaaS licence

—

Single education licence

—

The verdict

Asta Powerproject brings construction scheduling, cost planning, risk checks, and resource management into one tool. Check whether its Windows desktop or SaaS limits fit your workflow before choosing a licence.

What the maker publishes

Company
Elecosoft says it was founded in 1895 and operates centres of excellence in the UK, Sweden, Germany, the Netherlands, and the USA. source
Cost and resource management
It models budgeted, planned, and actual costs against time and supports resource planning for people, plant, and materials. source
Desktop platform
The standard Asta Powerproject client runs only on Microsoft Windows; its published system requirements specify Professional or Enterprise editions. source
Integrations
Asta Powerproject works with Microsoft Project and Oracle Primavera files and integrates with Bidcon estimating applications, ERP systems, and BIM tools. source
Privacy
Eleco plc says its privacy policy covers personal information collected through its website and software, and promises not to sell users' data. source
Project sharing
The free Project Viewer lets recipients view, navigate, and print plans created in Asta Powerproject, Microsoft Project, or Oracle Primavera. source
Purpose
Asta Powerproject is construction planning software for projects ranging from single-storey extensions to megaprojects. source
Risk and schedule checks
A built-in risk analysis tool assesses delay and cost-overrun risks, while Schedule Quality Check can use custom parameters or preconfigured DCMA and CIOB metrics. source
SaaS platforms and limits
The hosted web-based SaaS version is accessible on Windows and macOS computers with an internet connection, but macros and the Developers' Toolkit are examples of features unavailable in SaaS. source
Scenario planning
The software supports multiple what-if scenarios to compare construction methods or explore ways to accelerate delivery. source
Scheduling
Users can build schedules in a Gantt chart using task pools and code libraries, link tasks for critical-path analysis, and assign calendars, resources, and costs. source
Security
Project access can be controlled with security groups, users, access rights, and passwords; the help documentation warns that projects without a password may be accessible to anyone who knows a user's name. source
Support
Supported customers can access an online portal with a knowledgebase, current-version downloads, an add-on library, and product information; the maker also offers technical support, training, webinars, and implementation services. source

Checked against the maker's pages on 7 Oct 2026.