Schantt
schantt.com
- Free plan
- Web
What Schantt is
Schantt is web software for production scheduling in flowshop manufacturing. It offers Auto, Semi-Auto, and Manual modes, with finite-capacity planning, material constraints, and multiple machines working in parallel at each stage. Products can begin at any stage, follow variable routes, and skip stages. Lines can model batch and continuous-flow operations. Users configure product-to-product changeover times for each machine, while the scheduling algorithm seeks sequences that reduce total setup time. Shift calendars, holidays, overtime exceptions, and machine-specific or factory-wide downtime are supported. Machine-level Gantt charts can be shared through links. Teams use administrator and member roles with permissions tied to production setup or schedules. The Demo plan is free but limited to one user and five schedules. Standard costs $99 a month, billed $1188/year*, and Premium costs $199 a month, billed $2388/year*. Enterprise pricing is custom.
Who it suits
Schantt suits flowshop manufacturers planning production across stages, machines, materials, and changing calendars. It also fits teams that need role-based access and shareable schedule charts.
Good to know, and what to watch
- Supports Auto, Semi-Auto, and Manual scheduling
- Plans multiple parallel machines
- Models batch and continuous flow
- Configures downtime and shift calendars
- Provides shareable machine Gantt charts
- Demo plan allows one user
- Demo plan allows five schedules
- Standard starts at $99 a month
- Enterprise pricing is custom
Plans
Every plan and priceDemo
Enterprise
Standard
Premium
Free plan
The verdict
Schantt combines route-aware scheduling, machine capacity planning, changeover settings, and calendar controls for flowshop operations. Plan limits and paid tiers vary by team and production capacity.
What the maker publishes
- Calendars and downtime
- Users can configure shift calendars, holidays, overtime exceptions, and machine-specific or factory-wide downtime. source
- Changeovers
- Users can configure product-to-product changeover times for each machine, and the algorithm seeks sequences that minimize total setup time. source
- Data handling
- The maker says customers retain ownership of schedule data, team data is logically isolated, and schedule data is not used to train algorithms or models. source
- Data security
- The privacy policy says browser-to-server data uses TLS, database backups and sensitive data are encrypted at rest, and production system access is restricted by authentication. source
- Gantt charts
- It displays schedules in machine-level Gantt charts that can be shared with stakeholders through links. source
- Hosting location
- The privacy policy says service data is hosted in Oracle Cloud Infrastructure in the EU Frankfurt region. source
- Integrations and API
- The documentation mentions API integration for Enterprise, but the pages reviewed do not name a specific external integration. source
- Limits
- The free Demo plan is limited to one user and five schedules, while Standard and Premium have plan-specific team, user, and capacity limits. source
- Parallel machines
- It supports multiple machines working in parallel at each production stage. source
- Payment security
- Payments are processed by Paddle, which Schantt says is PCI DSS Level 1 compliant; Schantt says it does not store or process card details on its servers. source
- Production types
- It models batch and continuous flow operations in the same production line. source
- Purpose
- Schantt is production scheduling software designed for flowshop manufacturing environments. source
- Routing
- Products can start at any stage and follow variable routing paths, including skipping stages. source
- Scheduling modes
- It provides Auto, Semi-Auto, and Manual scheduling modes. source
- Support
- The contact page says Schantt typically responds to messages within 1–2 business days. source
- Team access
- Teams support administrator and member roles, with permissions to manage production setup or schedules according to role. source
Checked against the maker's pages on 8 Oct 2026.