What Open Planner Studio is
Open Planner Studio is a free, open-source construction planning tool for buildings, infrastructure and civil works. It provides Gantt charts, automatic critical-path calculation, resource histograms and automatic levelling when resources are overallocated. Schedules use native IFC 4.3; the app imports and exports IFC, CSV, MS Project XML and Primavera P6 XML, and opens MS Project MPP files natively. Construction calendars can include holidays, recesses, frost delays, inspections and project phasing, while task durations can be set in days or hours. Reports export as PDFs at approximately 220 DPI, on paper sizes up to A2, with baseline overlays and status or progress lines. A built-in MCP server lets compatible AI clients such as Claude Code read and edit schedules, with pause, read-only mode, backups and an activity panel. Schedules are stored as IFC files rather than a proprietary closed format. The app offers crash recovery, optional periodic saving to a writable project file and an offline manual in fourteen languages. It is marked Available Beta and runs on Linux, macOS, Windows and the web.
Who it suits
Open Planner Studio suits work planners, schedulers, project leads and BIM coordinators working on construction projects. It is marked Available Beta, and the maker invites these users to test it and provide feedback.
Good to know, and what to watch
- Free and open source with no per-seat licence fees
- Imports and exports several construction schedule formats
- Supports critical-path analysis and resource levelling
- Offline manual available in fourteen languages
- Product is marked Available Beta
- No mobile apps are listed
Plans
Every plan and priceFree and open source
Open Planner Studio
Free plan
Getting started
- Open the Open Planner Studio website
- Choose desktop or browser use on Linux, macOS, Windows, or the web
- Create or open a schedule using IFC 4.3 or a supported project format
- Configure calendars, phases, and task durations
- Plan with Gantt, critical-path, and resource tools
- Optionally connect a compatible AI client through the MCP server
Limits to check
The product is marked Available Beta, and mobile apps are not provided. The free plans have no subscription or per-seat licence fees.
The Club's review
Overview
Open Planner Studio is an open-source construction scheduling application for building, infrastructure and civil-works projects. It is best suited to planners, schedulers, project leads and BIM coordinators who need schedule data connected to open building information. The zero-cost licence and unusually broad file exchange are strong reasons to consider it, while its Available Beta status calls for care before making it the backbone of a live programme.
Schedules are saved as IFC 4.3 files, using the open buildingSMART standard instead of a proprietary schedule container. That makes the project data easier to carry into an IFC-oriented workflow and reduces dependence on one vendor's format. OpenAEC supports the product through a Foundation, OpenAEC Studio's implementation and professional services, and a contributor community. An offline manual in fourteen languages includes a quick start, practical guides, reference material and sample projects.
Key features
Construction scheduling and resources
Gantt charts show task timing, while automatic critical-path calculation highlights the sequence that controls the overall duration. Resource histograms make demand visible across the programme, and automatic levelling addresses overallocation rather than leaving planners to resolve every conflict manually. Durations can be entered in days or hours, which suits both high-level programmes and more detailed work packages.
Construction calendars can include holidays, recesses, frost delays, inspection points and project phasing. Those settings matter on site: a calendar that reflects weather and inspections produces a more credible plan than a generic working-week assumption.
Open formats and exchange
In addition to native IFC 4.3 schedules, the application imports and exports IFC, CSV, Microsoft Project XML and Primavera P6 XML, and opens Microsoft Project MPP files natively. This is a practical advantage when a project includes consultants or contractors using different planning systems. It also makes the tool more viable as an exchange or coordination layer than a scheduler limited to its own file type.
AI-assisted editing and control
A built-in MCP server allows compatible AI clients, including Claude Code, to read and edit schedules. Pause controls, read-only mode, automatic backups and an activity panel provide safeguards around that integration. Teams that do not use compatible AI clients gain nothing from this feature, but teams that do can delegate schedule queries or edits while retaining ways to stop or constrain access.
Reports and recovery
Reports export to PDF at approximately 220 DPI and support paper sizes through A2. Baseline overlays and status or progress lines help turn a schedule into a review document for stakeholders. Crash recovery is included, and optional periodic saving can write back to a writable project file; unsaved documents are not automatically overwritten, which protects the last saved project but requires deliberate saving discipline.
Pricing
Open Planner Studio is free and open source under LGPL-3.0. There is no subscription and no per-seat licence fee, so the published plans do not impose a user-count or recurring-software cost.
| Plan | Price | Includes |
|---|---|---|
| Free and open source | Free | Gantt charts, critical-path analysis, resource planning and levelling, IFC 4.3 schedules, and desktop and browser use |
| Open Planner Studio | Free | Free and open source under LGPL-3.0, with no subscription and no per-seat licence fees |
There is no free trial because the product itself is free. That removes a billing decision for small teams and makes broad evaluation possible, but organisations should still account for their own implementation, hosting or professional-support needs if they use OpenAEC Studio's services.
Platforms
Open Planner Studio runs on Linux, macOS, Windows and the web. There are no mobile apps, so site teams needing a dedicated Android or iOS experience should look elsewhere or use a browser on an existing device.
Who it's for
This is a strong candidate for work planners and schedulers who need Gantt, critical-path and resource controls without licence fees. BIM coordinators benefit from IFC-first storage and the ability to exchange schedules with CSV, Microsoft Project and Primavera P6 users. Project leads who issue formal programme reports can use PDF output with baselines and progress lines.
It is less suitable for buyers who require a clearly mature, production-established product or a mobile-first field workflow. The beta designation means teams should evaluate its fit and operating process before committing a mission-critical programme.
Pros and cons
Pros
- Open IFC storage: schedules remain in an open buildingSMART format instead of a proprietary container.
- Broad interchange: IFC, CSV, Microsoft Project XML, Primavera P6 XML and native MPP opening cover common planning handoffs.
- Serious construction controls: critical path, resource histograms, levelling and calendars for weather, inspections and phasing address real construction constraints.
- No licence or seat charge: both published plans cost nothing, with no subscription.
- Constrained AI access: MCP editing is paired with pause, read-only mode, backups and an activity panel.
Cons
- Available Beta: teams seeking a settled production platform face more adoption risk than with an established commercial scheduler.
- No mobile apps: Android and iOS users do not get a dedicated application for field access.
- Saving needs attention: periodic write-back is optional and unsaved documents are not automatically overwritten, so recovery protection does not replace a deliberate save process.
Alternatives
Choose usBIM.platform instead if you want Android and iOS access, web delivery and a free basic configuration with 10 GB of cloud storage; paid subscriptions add applications beyond that free tier.
Choose Trimble Quadri when a read-only model viewer with commenting and measurement is the priority; Quadri Viewer is free, while the full product uses custom pricing.
Choose Mastt Schedule for a web-only, month-to-month route with a first project free and a Professional plan priced at $165 a month.
Choose Nialli Visual Planner if you need Android, iOS, macOS, web and Windows coverage and a 30-day full-access trial; its single-plan subscription is $1,400 a year.
Choose GanttAI for a paid web scheduling product with a 30-day trial and a Portfolio Pro add-on priced at $100 a month.
Choose Birdog if a whole team needs a project-priced service rather than per-user billing; its project licence is $150 a month.
Choose Buildlr for a transaction-based model with no subscription or per-user charge, billed at 0.35% of each invoice sent through the platform.
Choose ConstructionOnline when an enterprise construction platform and annual contract are appropriate; its Enterprise plan starts at $36,840 a year.
For broader comparisons, see Construction Scheduling Software and Gantt Chart Software.
Verdict
Open Planner Studio is a compelling choice for construction teams that want capable scheduling, resource levelling and IFC-centred data without subscription or seat fees. Its main reason to choose it is the combination of open formats and construction-specific planning controls. Look elsewhere if beta status creates unacceptable operational risk or if mobile field applications are essential.
The verdict
Open Planner Studio combines construction scheduling with IFC-based files and broad project-format support. Its beta status is worth considering for teams evaluating it for project work.
Questions people ask
What does Open Planner Studio cost?
It is free and open source under LGPL-3.0. The listed plans are free, with no subscription or per-seat licence fees.
Which platforms can run it?
Open Planner Studio is available on Linux, macOS, Windows, and the web. There are no mobile apps.
What project-file formats are supported?
Schedules use native IFC 4.3. The app imports and exports IFC, CSV, MS Project XML, and Primavera P6 XML, and opens MS Project MPP files natively.
Can AI clients edit schedules?
A built-in MCP server lets compatible AI clients such as Claude Code read and edit schedules. It includes pause, read-only mode, automatic backups, and an activity panel.
Who maintains and supports the project?
OpenAEC describes a Foundation maintaining tools, OpenAEC Studio providing implementation, hosting, custom development, and professional support, and a contributor community.
What the maker publishes
- AI integration
- A built-in MCP server lets compatible AI clients such as Claude Code read and edit schedules, with pause, read-only mode, automatic backups and an activity panel. source
- Availability
- The product is marked Available Beta in the OpenAEC ecosystem. source
- Construction planning
- Users can configure construction calendars with holidays, recesses, frost delays, inspection moments and phasing, and set task durations in days or hours. source
- Data handling
- The product page says schedules are stored as IFC files, an open buildingSMART standard, rather than in a proprietary closed format. source
- File formats
- Schedules use native IFC 4.3 and the app imports and exports IFC, CSV, MS Project XML and Primavera P6 XML, as well as opening MS Project MPP files natively. source
- Headquarters
- Dordrecht, Netherlands source
- Intended users
- The maker invites work planners, schedulers, project leads and BIM coordinators to test the product and provide feedback. source
- Maker structure
- OpenAEC describes a Foundation that maintains tools, OpenAEC Studio that provides implementation, hosting, custom development and professional support, and a community of contributors. source
- Platforms
- The app runs in a browser and has desktop builds for Windows, macOS and Linux. source
- Purpose
- Open Planner Studio is an open source construction planning tool for buildings, infrastructure and civil works. source
- Reporting
- Reports support PDF export at approximately 220 DPI, paper sizes up to A2, baseline overlays and status or progress lines. source
- Saving and recovery
- The app offers crash recovery, and optional periodic saving back to a writable project file; unsaved documents are not automatically overwritten. source
- Scheduling
- It provides Gantt charts, automatic critical path calculation, resource histograms and automatic levelling of overallocation. source
- Support
- The app includes an offline manual in fourteen languages, with a quick start, practical guides, reference pages and sample projects. source
Checked against the maker's pages on 29 Sept 2026.